SolBase Aero
Cantilever and portal carport structures that turn parking, walkways and loading bays into generating roof.
Application
Car parks, two-wheeler sheds, bus bays, walkways and loading areas at factories, offices, hospitals and institutions. Single cantilever for one row of bays, portal frame for double rows.
Clear height, bay width and column grid follow the parking layout you send.
SolBase Aero spec table
Values in square brackets are indicative and confirmed in the design report issued with each quotation.
- Foundation
- RCC pedestal with anchor bolts Pedestal design supplied
- Tilt
- [5–10]° Drainage inside the rafter
- Module layout
- Landscape or portrait, [2–4] rows per frame
- Clear height
- [2.4–4.5] m to suit vehicles
- Primary members
- Hot-rolled column, cold-formed rafter, GI purlin HDG columns
- Wind basis
- Open-structure pressure coefficients per site wind speed IS 875 Pt.3
- Fasteners
- SS304 nuts, bolts and clamps No site welding
- Steel
- [E250 / S350GD] GI cold-rolled C, Z and U sections IS 2062 / IS 277
- Coating
- GI [275] gsm coil, or HDG post-fabrication [65–85] µm IS 277 / IS 4759
- Design basis
- Site wind speed and terrain per IS 875 Pt.3; member design per [IS 800] Design report supplied with every order
- Warranty
- [25] years structural Warranty document on request
- Column
- Hot-rolled section, HDG, base plate on anchor bolts
- Rafter
- Cold-formed C, cantilever or portal
- Purlin
- GI Z, slotted
- Gutter
- GI, integrated in the rafter line
- Clamps
- SS304 mid and end clamps
Datasheet, drawings, certificates
The SolBase Aero datasheet and section drawings are issued with each quotation while the public library is being prepared. Request the datasheet and it will be sent the same working day.
SolBase Aero questions
- How many cars does one Aero frame cover?
- A single cantilever frame covers one row of bays; a portal frame covers two rows back to back. The number of frames follows your parking layout.
- Where does rainwater go?
- The rafter line carries an integrated GI gutter that discharges at the column to a downpipe or drain of your choice.
- What foundation does Aero need?
- RCC pedestals with cast-in anchor bolts. We supply the pedestal design and the bolt template.
- Can the underside be finished?
- Yes. A false ceiling or lighting rail can be fixed to the purlins; tell us the load and we allow for it.
- Do you install?
- We supply the structure bundled and labelled with drawings. Installation is by your EPC or ours on request.
- What is the lead time?
- Drawings in [3] working days; fabrication from [2] weeks after drawing approval depending on tonnage.
Send a layout and we'll size SolBase Aero for your site.
Drawings and a priced bill of materials back in [3] working days. Or call +91 93478 15712.